AYN Odin 3 Base, Pro, Max & ULTRA

LPDDR5X
LPDDR5X

UFS 3.1
UFS 3.1

120Hz Display
120Hz Display

  • Processor: Qualcomm Snapdragon 8 Elite
  • Display: 1920×1080 6″ 120Hz AMOLED Touchscreen
  • RAM: Up To 24GB LPDDR5X
  • Storage: Up to 1TB UFS 3.1 / 128GB UFS 3.1
  • Connectivity: Wi-Fi 7 & Bluetooth 6
1-Year Warranty, Backed by Experience
Your purchase is protected by our 1-year warranty and 12+ years of trusted service. With over 500,000 happy customers, youโ€™re in safe hands.
Flexible & Secure Payment Options

Enjoy peace of mind with our secure checkout system. We support all major payment methods, including Debit/Credit Cards, PayPal, Apple Pay, Google Pay, Klarna, Afterpay, and Affirmโ€”giving you the freedom to pay your way, whether upfront or in easy installments.

Taxes

Prices shown do not include tax or import duties. Please check with your local authorities for any applicable fees. By placing an order, you agree to our Terms & Conditions and accept full responsibility for customs clearance and any taxes or duties due on delivery.

For Our USA Customers: Orders are dispatched DAP (Delivered At Place). While customers are responsible for payment of any applicable tariffs, we draw on our extensive experience shipping from the UK to ensure you pay the least possible charge. Based on our records, these charges typically do not exceed 10% of the item value.

Shipping and Returns
  • We work with over 10 trusted shipping partners to ensure your order arrives quickly, safely, and reliably.
  • Please note that shipping costs do not include customs duties or import taxes, which may be collected separately upon delivery.
  • Important Information About Returns:

  • If you decide to return your order or request a refund, please be aware that taxes and duties paid on your behalf under DDP terms cannot be refunded.
  • Please refer to our Terms & Conditions for detailed information.

    Customer Support

    Got a question? We’re a short text away from having your issue sorted!

    Package Includes
    • 1x AYN Odin 3
    • 1x USB Type-C Cable
    • 1x User Manual

    Availability:

    In Stock

    8people are viewing this right now

    $497.95

    Clear all
    PayPalVisaMastercardGoogle PayApple Pay
    Buy Now, Pay Later

    From $25.34/mo ยท 0% interest available

    -

    AYN Odin 3 Base, Pro, Max & ULTRA - Black, 8GB LPDDR5X / 128GB UFS 3.1

    AYN Odin 3 Base, Pro, Max & ULTRA - Black, 8GB LPDDR5X / 128GB UFS 3.1

    In Stock

    $497.95

    Colour: Black

    Configuration: 8GB LPDDR5X / 128GB UFS 3.1

    PayPalVisaMastercardGoogle PayApple Pay
    Help Icon
    Title
    Lorem ipsum, dolor sit amet consectetur adipisicing elit. Modi, ipsum!
    A pair of black AYN ODIN3 handheld gaming consoles is shown against a dark, featureless background. The foreground console is face-up, with its screen displaying a vibrant red and black abstract design. Its joysticks are prominently lit with a glowing red ring. The second console is positioned behind and above it, flipped over to show the back of the device, which features a textured grip and ventilation grilles. The text "ODIN3" is in the top left corner.

    AYN Odin 3: The Future of Portable Gaming

    Welcome to the next evolution in handheld gaming with the AYN Odin 3 โ€“ a device that redefines portable gaming with cutting-edge technology, sleek design, and unparalleled performance. Merging the best of modern advancements with an ergonomic and stylish form factor, the Odin 3 is engineered to deliver a seamless gaming experience whether at home or on the go.


    A promotional graphic for the AYN Odin3's screen. At the bottom of the image, a black AYN Odin3 handheld is shown with a red and black abstract design on its screen. Above the device, a list of screen specifications is provided: "Size 6-inch", "Refresh Rate 120Hz", "Peak Brightness 650 Nits", "Contrast Ratio 100,000:1", "Resolution 1080*1920", and "Color Gamut 152% sRGB". The top of the image has the title "The moment when exclusive customized 6" 120Hz AMOLED screen meets Odin3".

    A New Era in Portable Gaming

    The AYN Odin 3 pushes the boundaries of handheld gaming with its 6-inch 120Hz AMOLED display, offering breathtaking visuals with a modern design for a fully immersive experience. The Odin 3 provides a premium aesthetic with a smooth, responsive touchscreen, setting a new standard for gaming handhelds.

    A promotional graphic for the AYN Odin3's processor. The background is a glowing orange-red gradient. In the center, a red rectangular chip is shown with white text "Qualcomm 8 Elite 3nm". The text "The moment when Qualcomm 3nm flagship processor fits into Odin3" and "Powered by Qualcomm 8 Elite for the highest performance possible while keeping the price point affordable and sweet" is at the top of the image.

    Power and Portability Combined

    More than just a gaming console, the AYN Odin 3 is designed to handle both entertainment and demanding tasks. The 8 EliteProcess CPU, combined with the powerful Adreno 830 GPU, ensures smooth gameplay and stunning graphics. With Wi-Fi 7 and Bluetooth 5.4, you get next-gen, ultra-fast connectivity for online gaming and streaming, making this handheld a perfect companion for any setting.


    Detailed Features: Excellence in Every Aspect

    Performance At the heart of the Odin 3 lies the 8 EliteProcess chipset, built on a 3nm process. This powerhouse features Oryon cores clocked at up to 4.32GHz, ensuring fluid multitasking, rapid load times, and exceptional gaming performance. The Adreno 830 GPU complements the system, delivering console-quality graphics with smooth frame rates, even in the most demanding titles. The active cooling system ensures sustained peak performance.

    Memory and Storage Offering a comprehensive range of configurations, the Odin 3 is available with ultra-fast LPDDR5x RAM at 5300MHz:

    • Base: 8GB
    • Pro: 12GB
    • Max: 16GB
    • Ultra: 24GB

    Storage utilizes the high-speed UFS 3.1 standard:

    • Base: 128GB
    • Pro: 256GB
    • Max: 512GB
    • Ultra: 1TB

    These high-speed memory options allow for rapid data processing and seamless gameplay.

    User Experience

    Running on Android 15, the Odin 3 provides access to thousands of games, apps, and emulators. Its massive 8000mAh battery, paired with 60W fast charging, ensures extended play sessions without long downtimes. The USB 3.1 Type-C port supports DisplayPort Alt Mode, allowing for 4K @ 60Hz video output to an external screen.

    A Pioneer in Retro Gaming and Beyond The AYN Odin 3 excels at retro and modern gaming alike. Whether youโ€™re emulating classic consoles or playing the latest Android games, this device delivers an exceptional experience. With its ergonomic design and a compact form factor of just ~390g, it provides an intuitive and comfortable experience for extended gaming sessions.

    Be Part of the Gaming Revolution The AYN Odin 3 is more than just a gaming device โ€“ itโ€™s a revolution in portable entertainment. Whether youโ€™re an Android gamer, a retro gaming enthusiast, or a streaming aficionado, this handheld is built to elevate your experience. Donโ€™t miss out!

    A technical specification sheet for the AYN Odin3 in its "Base/Pro/Max/Ultra" variants, presented as a table against a dark grey background. The table lists the following features and specs: Processor (8 Elite), Process (3nm), CPU (2x4.32GHz Oryon and 6x3.53GHz Oryon), GPU (Adreno 830), Memory & Storage (LPDDR5x up to 24GB, UFS 3.1 128GB, UFS 4.0 up to 1TB), Screen (6-inch AMOLED 1080*1920 120Hz), Cooling (Active Cooling), Battery (8000mAh), Charging Speed (60Watt), Connectivity (Wi-Fi 7 + BT 6.0), Interface (USB-C, 3.5mm audio jack, TF card slot), Video Output (DisplayPort 4Kp60 Alt Mode), OS (Android 15), Size (224.8*87.5*16.6mm), and Weight (~390g).

    Additional information

    Connectivity
    Connectivity:: Not selected

    Wireless

    Wi-Fi:: Not selected

    Bluetooth:: Not selected

    Battery
    Battery Capacity:: Not selected

    8000 mAh

    Battery Type:: Not selected

    Li-Po

    Ports
    I/O Audio:: Not selected

    Output: 1x 3.5mm Headphone Jack, Speaker: Dual Speakers

    I/O USB:: Not selected

    I/O Video:: Not selected

    Display
    Resolution:: Not selected

    1920×1080

    Size:: Not selected

    6 Inch

    Aspect Ratio:: Not selected

    Pixels/Inch:: Not selected

    367 PPI

    Touchscreen:: Not selected

    Yes

    Refresh Rate:: Not selected

    Storage
    Storage Capacity:: Not selected

    128GB, 256GB, 512GB, 1TB

    Storage Expansion:: Not selected

    Storage Technology:: Not selected

    Memory (RAM)
    Memory (RAM) Capacity:: Not selected

    8GB, 12GB, 16GB, 24GB

    Memory (RAM) Technology:: Not selected

    Graphics
    Graphics (GPU) Brand:: Not selected

    Graphics (GPU) Model:: Not selected

    Graphics (GPU) Memory:: Not selected

    Processor
    Processor (CPU) Brand:: Not selected

    Processor (CPU) Model:: Not selected

    Processor (CPU) Base Frequency:: Not selected

    (2x Oryon Phoenix L) 4.32Ghz, (6x Oryon Phoenix M) 3.53Ghz

    Processor (CPU) Cores / Threads:: Not selected

    7 Cores

    Software
    Operating System:: Not selected

    Dual Boot:: Not selected

    No

    Dual Boot OS:: Not selected

    N/A

    Security:: Not selected

    PIN/Pattern/Image

    General
    Colour:: Black

    Rainbow, Black, Clear Blue, Clear Purple, White

    Security:: Not selected

    PIN/Pattern/Image

    Product
    Brands:: Not selected

    ,

    Configuration:: Not selected

    8GB LPDDR5X / 128GB UFS 3.1, 12GB LPDDR5X / 256GB UFS 3.1, 12GB LPDDR5X / 256GB UFS 4.0, 16GB LPDDR5X / 512GB UFS 3.1, 16GB LPDDR5X / 512GB UFS 4.0, 24GB LPDDR5X / 1TB UFS 3.1, 24GB LPDDR5X / 1TB UFS 4.0

    Colour:: Black

    Rainbow, Black, Clear Blue, Clear Purple, White

    Jeffrey Morris โœ“ Verified Purchase
    Aug 18, 2026

    Review for AYN Odin 3 Base, Pro, Max & ULTRA - Clear Blue, 12GB LPDDR5X / 256GB UFS 3.1

    DIRECT
    Was this helpful?
    Chris Redmond โœ“ Verified Purchase
    Aug 6, 2026

    Review for AYN Odin 3 Base, Pro, Max & ULTRA - Rainbow, 12GB LPDDR5X / 256GB UFS 3.1

    Best handheld Iโ€™ve owned so far.
    DIRECT
    Was this helpful?
    Hazlitt Eastman โœ“ Verified Purchase
    Jul 13, 2026

    Review for AYN Odin 3 Base, Pro, Max & ULTRA - Clear Blue, 16GB LPDDR5X / 512GB UFS 3.1

    DIRECT
    Was this helpful?
    Nathan Grieve โœ“ Verified Purchase
    Mar 7, 2026

    Quick efficient and secure.

    Ordered and it was delivered with in 3days.
    The customer service is exceptional i made an error typing my address and they fixed it in no time at all
    DIRECT
    Was this helpful?
    Darren Barnes โœ“ Verified Purchase
    Mar 5, 2026

    Top Handheld of the Year so far (IMHO)

    Android 15, means I can bind Gemini to long press power and get hints and tips in game.
    Plays PC games flawlessly.
    Screen is outstanding - no bezels - a big plus.
    All glass front - very sleek.
    cons:
    - no trigger locks for triggers
    - fan is a bit noisy for demanding games.
    DIRECT
    Was this helpful?

    Questions & Answers

    Have a question about this product? Get answers from our community.

    1
    Question
    โœ“ Answered
    1
    Q
    Asked by Patrick Metz
    Jul 14, 2026
    Hello, does the device still have UFS 4.0 or already UFS 3.1?
    A
    Support Team
    Jul 15, 2026
    It's UFS 3.1 on the latest stock of units.
    Was this helpful?